According to the project phase, the following services are offered:
PHASE A: PROJECT QUOTATION
- Detailed study of the project requirements / specifications.
- Contact with the parking system vendor for technical issues and prices.
- Preparation of the Technical Description and Quotation documents. Also any other relevant document as required by the tender terms.
 |
Technical Description samples |
PHASE Β': PARKING SYSTEM INSTALLATION
- Using CAD software, all necessary installation technical drawings are prepared. These usually include:
- Lane parking devices & sensors position plan drawing.
- Central cashier office equipment position plan and electrical drawing.
- Counting & guidance equipment plan drawing.
- Cable types principal electrical drawing.
- Parking machine and other equipment interconnection drawings.
 |
Entry - exit lane plan drawing example |
 |
Inspection at the Factory |
 |
Lab simulation tests |
- Upon goods receival, an inspection to verify the order quantities and their status is performed.
- In some cases, lab simulation tests are organised.
- During installation, supervision of equipment mounting and interconnection.
- Next, operation tests and setup of system parameters and parking fee rates.
PHASE C: END USER TRAINING - SUPPORT
- Preparation for the end-user of all equipment user manuals translated in Greek.
 |
Translated User manual sample |
- Training sessions, in regards to operation, management and basic preventive maintenance procedures.
 |
Maintenance manual |
- After project startup, technical support during warranty period: Both On site and also remote troubleshooting, parameter setting, installation of any software patches.
PHASE D': MAINTENANCE - ON GOING TECHNICAL SUPPORT
- Preparation of the maintenance contract based on factory documents.
 |
Factory maintenance documant |
- On going contact with factory customer support dept. to optimise project support.
- Creation of spare parts stock that is specific for the project.